Project:
PONNEQUIN WIND FARM, Weld County, Colorado
Project Owner:
Xcel Energy
Completion Date: 1998 / 2002
The Ponnequin Wind Farm is one of Xcel Energy’s initial
undertakings to provide alternative energy sources to its customer
base. With wind power sales exceeding expectations and with the
increase in popularity of alternative energies, the project quickly
became highly visible and fast-tracked.
During Phase I, Utility Engineering (UE) provided owner’s
engineering services and some detailed design. During subsequent
phases, UE provided engineering, procurement, construction and construction
management responsibilities for the 17 MW portion of the project
and overall project management responsibility for the entire 30
MW project.
Services Performed:
- Planning and site/turbine layout
- Turbine selection
- Project management, construction management and project controls
- Equipment specification and procurement
- Design of switchyard
- Design of power, control and communication to equipment
- Soil analysis and foundation design
- Construction of turbine foundation, turbine erection and substation
interconnect
- Checkout, start up and commissioning
- Design and construction management of maintenance facility