Project:
MEAG PLANT WANSLEY PROJECT, Franklin, Georgia, USA
Project Owner:
Colectric Partners, Inc.
Completion Date: April 2004
Colectric Partners, Inc. (Colectric) developed this facility which
is owned and operated by the Municipal Electric Authority of Georgia
(MEAG). The MEAG Plant Wansley facility, a greenfield project, provides
reliable power to MEAG’s growing base of customers and the
Southeast region's wholesale power market.
Utility Engineering (UE) and BE&K formed a Joint Venture partnership
for this 2-on-1, 500 MW combined cycle EPC project. This facility
consists of two General Electric (GE) Frame 7FA gas turbines, two
Nooter/Eriksen heat recovery steam generators and one GE steam turbine.
It is a modern, natural gas-fueled facility with state-of-the-art
emission controls.
UE provided all detailed civil/structural, mechanical, electrical
and controls balance of plant (BOP) engineering including all
procurement and construction specifications. In addition, UE provided
field engineer services during construction, checkout, start-up
and performance testing. Commercial operation occurred April 4,
2004, almost two months ahead of schedule.
This project received the Bentley 2004 BE Award of Excellence
Plant Award for Information Management.
Services Performed:
- Plant layout and estimating
- Detailed BOP engineering
- Procurement specifications
- Field engineering
- Start-up and performance testing
- Operator training