Project:
CHIEF ETHANOL ELECTRICAL EXPANSION, LOAD FLOW ANAYLSIS & ARC
FLASH STUDY Hastings, NE
Project Owner:
Chief Ethanol Fuels, Inc.
Completion Date: Sept. 2007
The project required an expansion of the existing electrical
system to handle an additional load. The 13.8kV primary distribution
system was tapped and cable duct was added to a new power transformer
in coordination with the local utility.
Secondary side, outdoor
switchgear was added with new foundations along with a new MCC
and distribution equipment. Additional tray was routed, and new
underground feeders were installed to provide the additional capacity
to accommodate the project.
An arc flash study was completed for
the entire electrical distribution system. The distribution system
was waked down and a model was developed for load flow and arc
flash simulations.
|