Home   Contact Us   Site Map
 
 

Use of this site requires Flash Player 8 or higher. Please install Flash Player, by clicking here:
http://www.adobe.com
/go/getflashplayer/.

 

Use of this site requires Flash Player 8 or higher. Please install Flash Player, by clicking here:
http://www.adobe.com
/go/getflashplayer/.

Project:
ARAPAHOE COAL UNLOADING PROJECT, Denver, Colorado, USA

Project Owner:
Public Service Company of Colorado, an Xcel Energy company

Completion Date: 1999

Utility Engineering (UE) was responsible for the engineering, procurement, construction and construction management of a new coal unloading system for the Public Service Company of Colorado’s (PSCo) Arapahoe Generating Station.

The project was designed to allow continuous unloading from railcars and included a bottom dump rail car coal unloading system, take-away conveying and radial stack-out systems, a reclaim conveying system and an installation of the facility’s rail loop. All associated balance of plant (BOP) systems were included.

Services Performed:

  • Project and construction management
  • Detailed engineering design
  • Specifications and material procurement
  • Project controls
  • Checkout, start-up and training
  • As-built documentation

^ Back To Top


Contact Us
Utility Engineering Corporation